Skip to content
Back to case studies

0→1

Designing a new product from zero to one

Took an ambiguous problem space to a shipped, validated MVP — defining the product as much as the interface.

Role
Lead Designer
Year
2022
Timeline
Jun 2022 – Feb 2023

Overview

There was a hypothesis, a small team, and a blank canvas. The job was to turn an ambiguous opportunity into something real enough to test with customers — fast, without over-building.

Role & contribution

As lead designer I owned the product definition alongside the founders: the core loop, the first flows, and the narrative we used to align the team and early users.

Approach

I worked in tight loops — sketch, prototype, test, decide — and used a thin “walking skeleton” to validate the riskiest assumption first.

01Hypothesis
02Prototype
03Test
04Decide
Each loop retired the biggest open risk.

The fastest way to find the product was to stop arguing and put a prototype in front of someone.

TODO — founder quote
MVP
TODO — replace with the first shipped version of the core flow.

Outcome / impact

We shipped a focused MVP in twelve weeks and onboarded the first pilot customers, turning a hypothesis into a validated direction.

12 weeks
From concept to a tested MVP

Reflection

0→1 rewards subtraction. Almost everything we didn’t build is what let us learn quickly enough to build the right thing next.